• About us
  • Presenters
  • Shows
  • VIDEOS
  • PODCASTS
Tuesday, June 30, 2026
Angel Online
  • Home
  • Elections
  • Politics
  • News
    • Local News
  • Business
  • Education
  • Health
    • Lifestyle
  • Entertainment
  • Features
  • World
No Result
View All Result
  • Home
  • Elections
  • Politics
  • News
    • Local News
  • Business
  • Education
  • Health
    • Lifestyle
  • Entertainment
  • Features
  • World
No Result
View All Result
Angel Online
No Result
View All Result
Home News

Contractors on Boankra project told to justify decision to select them

Jerry Tsatro Mordy by Jerry Tsatro Mordy
November 8, 2020
in News, Top Story
Reading Time: 3 mins read
0 0
0
Transport Minister Kwaku Ofori Asiama

Transport Minister Kwaku Ofori Asiama

Share on FacebookShare on Twitter

The Minister for Transport, Kwaku Ofori Asiamah, has sent a note of caution to the consortium of contractors working on the Boankra Inland Port Project, especially, the Ghanaian partner, to maintain focus and deliver quality work.

This, stated, will justify the confidence reposed in indigenous contractors by the President, Nana Akufo-Addo.

According to him, the delivery of quality work and on the scheduled three-year period, will pave the way for more local contractors to be awarded with such big projects.

He said it was as a result of President Akufo-Addo’s confidence reposed in indigenous contractors that he (the President) instructed that Boankra Inland Port Project be awarded to a Ghanaian contractor with the requisite expertise to lead the execution of the inland port project which is of paramount importance to the government.

“The President called me one day and gave a specific directive that this project should be led by an indigenous Ghanaian contractor with the requisite knowledge to partner a foreign investor to execute the project.

“After going through a long diligent process, Ashanti Port Services Limited (APSL) which is a consortium of Afum Quality Limited Ghana and DSS Associates of Korea emerged as the preferred partner to develop the Boankra Integrated Logistics Terminal Project. I am therefore, cautioning the consortium not to disgrace themselves”, he cautioned.

He added “If you fail to deliver quality work and on the scheduled time frame, the impression is that the President will no longer have confidence in indigenous Ghanaian contractors for them to be awarded with such a big project in future. The US$400million Takoradi port expansion project is being led by an indigenous Ghanaian contractor. It was based on the quality of work being executed that this project was awarded to this consortium. I am optimistic that with the confidence that the President has reposed in you, you will not let him down”.

RelatedPosts

Over 470 rescued as Accra floods, fires kill 5 between June 28-30 – GNFS reports

United Party blames 63 years of inaction for Accra floods, calls for revival of 1963 Master Plan

Accra recorded 140mm of rain on June 29, one of the highest in years – Prez. Mahama

The Transport Minister made these observations in his address when he assisted the President, and the Asantehene, Otumfuo Osei Tutu II, to cut the sod for work to begin on the Boankra Inland Port Project on Thursday, November 5, 2020.

Transport Minister Kwaku Ofori Asiama
Transport Minister Kwaku Ofori Asiama

Commenting further, he told the consortium that the realisation of the Boankra Inland Port Project constitutes an integral part of the country’s strategic transport network to bring import and export services close to the door-steps of shippers in the middle and northern part of Ghana as well as the neighbouring land-locked countries of Burkina Faso, Mali and Niger.

Therefore, his outfit will not countenance low quality and late delivery of the project, stressing that the project is long overdue and Ghanaians deserve better.

Promise to deliver 

The Chief Executive Officer of Affum Quality Limited, Mr. Isaac Affum, responding to the call made by the Transport Minister assured that his outfit and their partner, DSS and Associates of Korea have the requisite skills to deliver a world class project that will make President Akufo-Addo and Ghanaians proud.

Project money ready

He said to ensure work on the project go as planned, the US$330million meant to finance the project is ready, noting that “now that the President has cut the sod for commencement of work on site, nothing is going to stop or delay us from delivering”.

According to Mr. Affum, the project will focus heavily on the construction of specialized warehouses for the storage of cocoa beans and grains. Therefore, they will provide customized warehousing, processing and storage facilities for target companies currently operating in Ghana such as the Ghana COCOBOD, GHACEM, National Food Buffer Stock Company (NAFCO), Cargill, Nestle, Guinness, Premium Foods and ADM Cocoa (Ghana) Limited.

He revealed that the consortium will position the Boankra Integrated Logistics Terminal to attract new market participants such as Lotte Logistics, CJ Logistics, Daewoo Logistics and Logis all from Korea; ALSCO from China; and NDW from Netherlands.

“We are also going to construct warehouses for the storage of petroleum and petrochemical products, cement and other bulk cargo and these are going to be done in phases. We have a plan to guide us and the money to execute the project. We are going to deliver a project that everybody will be proud about”, he noted.

Benefits

The dry port project, according to Hon. Asiamah, when completed will among other things:
• Augment the competitive positioning of imports and exports services closer to the door steps of shippers in the northern part of the country;
• Improve the operational efficiency at the main two (2) seaports of Tema and Takoradi;
• Facilitate greater levels of international trade with the three landlocked countries of Burkina Faso, Mali and Niger;
• Create a commercial hub in the middle belt of the country through the establishment of a logistics and supply chain system around the terminal facility;
• Promote technology and skills transfer to strengthen the local resource stock needed for the country’s development; and
• Create 3,000 direct and over 60,000 indirect employment for Ghanaians.

Background

The Boankra Integrated Logistics Terminal (BILT), strategically located near Kumasi, was initiated by the Ghana Shippers Authority (GSA) and the Ghana Ports and Harbours Authority (GPHA) in the early 1990’s to create a dry port as an extension to the Tema Port.

BILT is to be developed on a 413-acre parcel of land located 27 kilometers from Kumasi in the Ashanti Region.

The Concession Agreement for the BILT is for 30 years including a three-year construction period. The Concessionaire is Ashanti Port Services Limited (APSL), a consortium consisting of Afum Quality Limited of Ghana and DSS Associates of South Korea.

Tags: Boankra portKwaku Ofori AsiamaTransport Minister
Jerry Tsatro Mordy

Jerry Tsatro Mordy

RelatedPosts

Over 470 rescued as Accra floods, fires kill 5 between June 28-30 – GNFS reports

Over 470 rescued as Accra floods, fires kill 5 between June 28-30 – GNFS reports

by Georgina Appiah Amponsah
June 30, 2026
0

The Ghana National Fire Service (GNFS) has evacuated over 479 people and recorded 5 deaths while responding to fires, floods...

United Party urges NPP voters to back Alan Kyerematen, calls party ‘moribund’

United Party blames 63 years of inaction for Accra floods, calls for revival of 1963 Master Plan

by Georgina Appiah Amponsah
June 29, 2026
0

The United Party (UP) has said Ghana’s annual flooding in Accra and other parts of the country reflects 63 years...

Accra recorded 140mm of rain on June 29, one of the highest in years – Prez. Mahama

Accra recorded 140mm of rain on June 29, one of the highest in years – Prez. Mahama

by Georgina Appiah Amponsah
June 29, 2026
0

President John Dramani Mahama has said the heavy rains that hit Accra on Monday, June 29, 2026 are among the...

Gov’t intensifies response to flooding, urges public cooperation after Accra, Tema downpours

Gov’t intensifies response to flooding, urges public cooperation after Accra, Tema downpours

by Georgina Appiah Amponsah
June 29, 2026
0

The Government has intensified efforts to respond to flooding in Accra, Tema and surrounding areas after sustained heavy rains since...

EPA CEO blames plastics, building on waterways for Accra flooding

EPA CEO blames plastics, building on waterways for Accra flooding

by Mubarak Yakubu
June 29, 2026
0

The Chief Executive Officer of the Environmental Protection Agency (EPA), Prof. Nana Ama Browne Klutse, has attributed the recurring flooding...

KMA issues final notice to remove unauthorised structures around Baba Yara Sports Stadium by July 30

KMA issues final notice to remove unauthorised structures around Baba Yara Sports Stadium by July 30

by Georgina Appiah Amponsah
June 29, 2026
0

The Kumasi Metropolitan Assembly (KMA) has issued a final notice to all owners of temporary structures around the Baba Yara...

Next Post
Justice Yaw Ofori

Spotlight on the CEOS’ CEO – Mr Justice Ofori, Commissioner of Insurance

Otabil

Pastor Otabil's message inspired me to bite off robber's penis - Victim

Connect with us

  • 870k Fans
  • 3.3k Followers
  • 278.1k Followers
  • 151k Subscribers

FIFA World Cup Updates

Category

  • Africa
  • Athletics
  • Business
  • Education
  • Elections
  • Entertainment
  • Features
  • Football
  • Health
  • Latest News
  • Lifestyle
  • Local News
  • Love and Sex
  • News
  • Opinion
  • Politics
  • Security
  • Sports
  • Tech
  • Top Story
  • Transportation
  • World
  • About us
  • Presenters
  • Shows
  • VIDEOS
  • PODCASTS

©2026- Angel Online

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • Home
  • Elections
  • Politics
  • News
    • Local News
  • Business
  • Education
  • Health
    • Lifestyle
  • Entertainment
  • Features
  • World

©2026- Angel Online