• About us
  • Presenters
  • Shows
  • VIDEOS
  • PODCASTS
Wednesday, June 10, 2026
Angel Online
  • Home
  • Elections
  • Politics
  • News
    • Local News
  • Business
  • Education
  • Health
    • Lifestyle
  • Entertainment
  • Features
  • World
No Result
View All Result
  • Home
  • Elections
  • Politics
  • News
    • Local News
  • Business
  • Education
  • Health
    • Lifestyle
  • Entertainment
  • Features
  • World
No Result
View All Result
Angel Online
No Result
View All Result
Home Features

Mahama inspects Pokuase–Nsawam road project, urges quality work

Samuel Sackey by Samuel Sackey
September 3, 2025
in Features, Top Story
Reading Time: 1 min read
0 0
0
Mahama inspects Pokuase–Nsawam road project, urges quality work
Share on FacebookShare on Twitter

President John Dramani Mahama has urged contractors working on the Pokuase–Nsawam road project to ensure quality construction and proper traffic management to ease congestion for commuters.

The presidential visit follows the government’s full financial commitment to the project, with the Controller and Accountant-General, Kwasi Agyei, confirming that a total of GH₵809 million has been disbursed to the contractor, Maripoma Enterprise Limited, as of August 4, 2025.

Speaking during the inspection of the road, President Mahama stressed that the road is an important arterial route, as it connects the two biggest cities in Ghana.

President Mahama during the inspection on Wednesday, September 3 2025.

He acknowledged that any challenge with the project affects a large number of commuters due to heavy traffic.

“So, as government commits to pay you well, you too must commit to move faster on the road construction and also use quality materials. One of the major problems with road contractors in this country is the quality of road materials, so, you construct the roads and it starts to deteriorate.

“And so any challenges with this contract affect a huge number of commuters because of the heavy traffic that passes through here so we were quite concerned about the complaints that were coming from the travelling public. So we are happy to see that the traffic is flowing,” he said.

He reminded the contractor that while work must continue, site management is also important, and construction activities must not block the smooth flow of traffic.

RelatedPosts

KATH doctors suspend strike after Otumfuo’s intervention

Former MASLOC CEO Sedina Tamakloe extradited from US to Ghana

Gov’t activates surveillance, isolation systems to counter Ebola threat

“I can see that drivers are happy now and I hope that from now till when you finish the project, you maintain a smooth flow of traffic even as you are working so that you don’t impede the flow of traffic.”

Mr. Mahama emphasized that government support comes with expectations, urging contractors to speed up work and use quality materials to complete the project as stipulated.

Tags: InspectionPokuase–Nsawam roadPresident Mahama
Samuel Sackey

Samuel Sackey

RelatedPosts

Striking KATH doctors revert decision less than 24 hours

KATH doctors suspend strike after Otumfuo’s intervention

by Samuel Sackey
June 9, 2026
0

Doctors at the Komfo Anokye Teaching Hospital (KATH) have suspended their industrial action following what they described as fruitful engagements...

Former MASLOC CEO Sedina Tamakloe extradited from US to Ghana

Former MASLOC CEO Sedina Tamakloe extradited from US to Ghana

by Samuel Sackey
June 9, 2026
0

Former Chief Executive Officer of the Microfinance and Small Loans Centre (MASLOC), Sedina Tamakloe Attionu, has been extradited from the...

Ghana Ebola threat

Gov’t activates surveillance, isolation systems to counter Ebola threat

by Jerry Tsatro Mordy
June 8, 2026
0

The government has activated surveillance and isolation systems at key border posts to help detect and prevent the spread of...

Devote full commitment to your core mandates and stop chasing awards – Mahama tells appointees

Devote full commitment to your core mandates and stop chasing awards – Mahama tells appointees

by Samuel Sackey
June 8, 2026
0

President John Dramani Mahama has advised all government appointees to prioritise their core mandates and responsibilities rather than pursuing questionable...

Gov’t to issue 24-hour statement on Bawku mediation report – Mahama

Mahama bans appointees from accepting private awards without presidential approval

by Samuel Sackey
June 8, 2026
0

President John Dramani Mahama has placed a ban on all Ministers of State, Chief Executive Officers of State Institutions, and...

I need you all to return to duty – Suspended KATH CEO appeals to striking staff

I need you all to return to duty – Suspended KATH CEO appeals to striking staff

by Samuel Sackey
June 8, 2026
0

The suspended Chief Executive Officer of the Komfo Anokye Teaching Hospital (KATH), Dr. (Med) Paa Kwesi Baidoo, has urged staff...

Next Post
Lack of national policy plan linked to Ghana’s setback – Hajia Hamdatu

Dismissed CJ earned my respect for refusal to resign – Hajia Hamdatu

I started backing Daddy Lumba at 16 – Yvonne Ohene Gyan

I started backing Daddy Lumba at 16 – Yvonne Ohene Gyan

Connect with us

  • 870k Fans
  • 3.3k Followers
  • 278.1k Followers
  • 151k Subscribers

Category

  • Africa
  • Athletics
  • Business
  • Education
  • Elections
  • Entertainment
  • Features
  • Football
  • Health
  • Latest News
  • Lifestyle
  • Local News
  • Love and Sex
  • News
  • Opinion
  • Politics
  • Security
  • Sports
  • Tech
  • Top Story
  • Transportation
  • World
  • About us
  • Presenters
  • Shows
  • VIDEOS
  • PODCASTS

©2026- Angel Online

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • Home
  • Elections
  • Politics
  • News
    • Local News
  • Business
  • Education
  • Health
    • Lifestyle
  • Entertainment
  • Features
  • World

©2026- Angel Online